Soli Deo Gloria Candle Company
Bright Citrus | Natural Beeswax Candle with Organic Essential Oils
Bright Citrus | Natural Beeswax Candle with Organic Essential Oils
Refresh your home with Bright Citrus, a hand-poured 100% beeswax candle scented with pure essential oils of sweet orange, eucalyptus, and lemon peel. Designed for a clean, uplifting atmosphere, this non toxic candle brings a bright, fresh scent to your space using simple, high-quality ingredients.
Want to skip the flame? Try under a warmer!
Ingredients / Materials
Ingredients / Materials
- Bright Citrus: Cera Alba (Beeswax), Hemp Wick (Organic Hemp Fiber coated in Beeswax), Eucalyptus Globulus Leaf Oil, Citrus Limon (Lemon) Peel Oil, Citrus Sinensis (Sweet Orange) Peel Oil
Product Details
Product Details
- Hand-poured 100% pure beeswax candle
- Organic hemp wick coated in beeswax
- Scented with pure essential oils and botanical ingredients
- Clean-burning and long-lasting
- Available Sizes:
Amber Candle: 7.2oz | Up to 40 hour burn time
Frosted Double Wick Amber Candle: 10oz | Up to 50 hour burn time - Matching wax melts available separately
- Made in small batches with care
What Makes Our Products Different
What Makes Our Products Different
Quality and transparency guide everything we make. Our products are handcrafted in small batches with thoughtfully selected ingredients, free from synthetic fragrance and unnecessary additives. All essential oils are third party GC-MS tested for purity, and products are air-quality tested to ensure a clean, gentle fragrance experience for the home.
- Transparent
- Sustainable
- Toxin-Free
Couldn't load pickup availability
Order & Shipping Details
Order & Shipping Details
- Each product is handmade with care.
- Processing takes 0-5 days, depending on order size and season. (We welcome custom and bulk orders—message us for details!)
- If any order details need clarification, we’ll reach out within 48 business hours.
- Please review our candle safety & care guidelines included with each order.
*For health and safety reasons, we cannot accept returns or exchanges. Our pure products are designed for a natural, subtle fragrance, and we do not issue refunds for scent strength or personal preference.
Share

A Softer Standard
“So clean and gentle—finally a product I feel good bringing into my home.”
- 5 stars: 2 (100%)
- 4 stars: 0 (0%)
- 3 stars: 0 (0%)
- 2 stars: 0 (0%)
- 1 star: 0 (0%)
I loved my first order so much I ordered more to gift to the moms in my life for Mother’s Day! The bright citrus scent smells fantastic and knowing I’m using a toxin free option in my home is so important to me and my family! Thank you for creating a toxin free option I can trust!!
Warms my heart so much that you are enjoying your candles! ♥️
This is the perfect amount of citrus and reminds me of sipping a summery drink. Definitely recommend if you’re a fan of citrusy scents!