Soli Deo Gloria Candle Company
Warm Vanilla Beeswax Candle | Plant Extract Infused
Warm Vanilla Beeswax Candle | Plant Extract Infused
Indulge in the comforting sweetness of pure vanilla. Smooth, creamy, and warmly inviting, these candles and wax melts fill your space with a soft, homely aroma that’s perfect for creating a cozy, peaceful atmosphere. These are fragrance oil and essential oil free!
Ingredients / Materials
Ingredients / Materials
- Warm Vanilla: Vanilla Planifolia Fruit Extract (Vanilla CO2 Extract)
- Pure Beeswax (Cera Alba)
- Organic Hemp Wick
- Container Material: Glass
Product Details
Product Details
- Amber Candle: 7oz & up to 40 hour burn time
- Frosted Double Wick Amber Candle: 10oz & up to 50 hour burn time
Pure beeswax and organic hemp candles require extra care. Be sure to read care cards.
They are not “set it and forget it” candles. Trim wicks to ⅛” before every burn and monitor while burning. If the flame becomes large, extinguish, allow to cool, trim, and relight. If the wick curls, gently expose and trim before lighting. Regular wick trimming promotes a cleaner, safer, longer-lasting burn with less soot and optimal scent throw.
What Makes Our Products Different
What Makes Our Products Different
Quality and transparency guide everything we make. Our products are handcrafted in small batches with thoughtfully selected ingredients, free from synthetic fragrance and unnecessary additives (no coconut oil or “natural” scent boosters). All essential oils are third party GC-MS tested for purity, and products are air-quality tested to ensure a clean, gentle fragrance experience for the home. Our scents are intentionally light and natural—just as you’d expect from a truly 100% natural product.
- Transparent
- Sustainable
- Toxin-Free
Couldn't load pickup availability
Order & Shipping Details
Order & Shipping Details
- Each product is handmade with care.
- Processing takes 0-5 days, depending on order size and season. (We welcome custom and bulk orders—message us for details!)
- If any order details need clarification, we’ll reach out within 48 business hours.
- Please review our candle safety & care guidelines included with each order.
*For health and safety reasons, we cannot accept returns or exchanges. Our pure products are designed for a natural, subtle fragrance, and we do not issue refunds for scent strength or personal preference.
Share

A Softer Standard
“So clean and gentle—finally a product I feel good bringing into my home.”
- 5 stars: 1 (100%)
- 4 stars: 0 (0%)
- 3 stars: 0 (0%)
- 2 stars: 0 (0%)
- 1 star: 0 (0%)
These are by far the best candles that I have ever bought. Bonus they are all non toxic. No dangerous chemicals . I have tried so many different scents and never disappointed.