Skip to product information
1 of 14

Soli Deo Gloria Candle Company

Wildflower Meadow | Floral Beeswax Candle with Organic Essential Oils

Wildflower Meadow | Floral Beeswax Candle with Organic Essential Oils

Bring the beauty of a blooming meadow into your home with Wildflower Meadow, a hand-poured 100% beeswax candle scented only with USDA organic oils like lavender, Egyptian geranium, and lemongrass essential oils. Soft, floral, and uplifting, this clean-burning candle creates a peaceful atmosphere with simple, natural ingredients.

Looking for this scent in wax melts? Find it here.

Ingredients / Materials

  • Wildflower: Organic Lavandula Angustifolia Oil (Lavender), Organic Cymbopogon Flexuosus Oil (Lemongrass), Organic Pelargonium Graveolens Flower Oil (Egyptian Geranium)
  • Organic Hemp Wick
  • Pure Beeswax (Cera Alba)

Product Details

  • Amber Candle: 7.2oz | Up to 40 hour burn time
  • Frosted Double Wick Amber Candle: 10oz | Up to 50 hour burn time

Pure beeswax and organic hemp candles require extra care. Be sure to read care cards.
They are not “set it and forget it” candles. Trim wicks to ⅛” before every burn and monitor while burning. If the flame becomes large, extinguish, allow to cool, trim, and relight. If the wick curls, gently expose and trim before lighting. Regular wick trimming promotes a cleaner, safer, longer-lasting burn with less soot and optimal scent throw.

What Makes Our Products Different

Quality and transparency guide everything we make. Our products are handcrafted in small batches with thoughtfully selected ingredients, free from synthetic fragrance and unnecessary additives (no coconut oil or “natural” scent boosters). All essential oils are third party GC-MS tested for purity, and products are air-quality tested to ensure a clean, gentle fragrance experience for the home. Our scents are intentionally light and natural—just as you’d expect from a truly 100% natural product.

  • Transparent
  • Sustainable
  • Toxin-Free
Quantity
Regular price $34.00 USD
Regular price Sale price $34.00 USD
Sale Sold out
Shipping calculated at checkout.

Order & Shipping Details

  • Each product is handmade with care.
  • Processing takes 0-5 days, depending on order size and season. (We welcome custom and bulk orders—message us for details!)
  • If any order details need clarification, we’ll reach out within 48 business hours.
  • Please review our candle safety & care guidelines included with each order.

*For health and safety reasons, we cannot accept returns or exchanges. Our pure products are designed for a natural, subtle fragrance, and we do not issue refunds for scent strength or personal preference.

View full details
Wildflower Meadow | Floral Beeswax Candle with Organic Essential Oils

A Softer Standard

“So clean and gentle—finally a product I feel good bringing into my home.”

  • 5 stars: 1 (100%)
  • 4 stars: 0 (0%)
  • 3 stars: 0 (0%)
  • 2 stars: 0 (0%)
  • 1 star: 0 (0%)
E
Emily
A Beautiful candle that adds such a comforting and luxurious feeling to our home

A Beautiful candle that adds such a comforting and luxurious feeling to our home. I love that these candles are 100% clean for my family and others who visit our home.